Cite

Aaltonen, K., & Turkulainen, V. (2018). Creating relational capital through socialization in project alliances. International Journal of Operations & Production Management, 38(6), 1387-1421.10.1108/IJOPM-02-2017-0091Search in Google Scholar

Ahsan, K., & Paul, S. K. (2018). Procurement issues in donor-funded international development projects. Journal of Management in Engineering, 34(6), 01-44.10.1061/(ASCE)ME.1943-5479.0000648Search in Google Scholar

Alsuliman, J. A. (2019). Causes of delay in Saudi public construction projects. Alexandria Engineering Journal, 58(2), 801-808.10.1016/j.aej.2019.07.002Search in Google Scholar

Ansah, R. H., & Sorooshian, S. (2018). 4P Delays in Project Management. Engineering, Construction and Architectural Management, 25(1), 62-76.10.1108/ECAM-09-2016-0199Search in Google Scholar

Baal, A., & Outridge, D. (2020). Subsidiary project plan requirements for public construction projects in Trinidad and Tobago. The International Conference on Emerging Trends in Engineering and Technology (IConETech 2020).10.47412/JRND8949Search in Google Scholar

Belton, I., MacDonald, A., Wright, G., & Hamlin, I. (2019). Improving the practical application of the Delphi method in group-based judgment: A six-step prescription for a well-founded and defensible process. Technological Forecasting and Social Change, 147(1), 72-82.10.1016/j.techfore.2019.07.002Search in Google Scholar

Bodea, C-N., & Purnus, A. (2016). FIDIC Contracts: Analysis of the Impact of General and Particular Conditions on the Financial Risk Management in Romanian Infrastructure Projects. Juridical Tribune Journal, 6(2), 167-181.Search in Google Scholar

Braun, V., & Clarke, V. (2016). (Mis) conceptualising themes, thematic analysis, and other problems with Fugard and Potts’ (2015) sample-size tool for thematic analysis. International Journal of Social Research Methodology, 19(6), 739-743.10.1080/13645579.2016.1195588Search in Google Scholar

Cosa, S. (2020). Exploring the factors responsible for the delays in the execution of construction projects by the national department of public works and infrastructure in South Africa. Johannesburg: University of Johannesburg. Retrieved fromhttp://hdl.handle.net/102000/0002Search in Google Scholar

Darko, A., Zhang, C., & Chan, A. P. (2017). Drivers for green building: A review of empirical studies. Habitat International, 60(1), 34-49.10.1016/j.habitatint.2016.12.007Search in Google Scholar

Davis, K. (2018). Reconciling the views of project success: A multiple stakeholder model. Project Management Journal, 49(5), 38-47.10.1177/8756972818786663Search in Google Scholar

Deep, S., Bilal, M., & Ahmad, S. (2017). A study of various factors affecting contractor’s performance in lowest bid award construction projects. International Journal of Civil Engineering and Technology, 8(2), 28-33.Search in Google Scholar

Durdyev, S., & Hosseini, M. R. (2019). Causes of delays on construction projects: a comprehensive list. International Journal of Managing Projects in Business, 1(1), 01-28.10.1108/IJMPB-09-2018-0178Search in Google Scholar

Fillion, G., Koffi, V., & Ekionea, J-P. B. (2017). Peter Senge’s Learning Organization: A Critical View and the Addition of Some New Concepts to Actualize Theory and Practice. Journal of Organizational Culture, Communications and Conflict, 19(3), 73-102.Search in Google Scholar

Fong, C. K., Avetisyan, H. G., & Cui, Q. (2014). Understanding the Sustainable Outcome of Project Delivery. Methods in the Built Environment, Organization, Technology & Management in Construction, 6(3), 1141-1155.10.5592/otmcj.2014.3.9Search in Google Scholar

Franco, L. A., & Nielsen, M. F. (2018). Examining group facilitation in situ: the use of formulations in facilitation practice. Group Decision and Negotiation, 27(5), 735-756.10.1007/s10726-018-9577-7Search in Google Scholar

Gambo, N., Said, I., & Ismail, R. (2016). Influences of Cost Factors Affecting Technical Performance of Local Government Projects in Nigeria: A Partial Least Square-Structural Equation Modeling (PLS-SEM) Approach. Journal of Construction in Developing Countries, (21), 85-111.10.21315/jcdc2016.21.1.5Search in Google Scholar

Gebrehiwet, T., & Luo, H. (2017). Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study. Procedia Engineering, 196, 366-374.10.1016/j.proeng.2017.07.212Search in Google Scholar

Gomes, C. F., & Yasin, M. M. (2017). Toward promoting effective strategic performance: the relevance of the alignment of performance measurement and competitive strategic choices. International Journal of Business Excellence, 12(3), 329-350.10.1504/IJBEX.2017.084445Search in Google Scholar

Gunduz, M., & Abu Hassan, M. H. A. (2017). Mapping the industrial perception of delay data through importance rating. Arabian Journal for Science and Engineering, 42(1), 3799-3808.10.1007/s13369-017-2477-3Search in Google Scholar

Hurta, H., Jazouli, A., Koplyay, T., & Motaghi, H. (2017). Mergers and acquisitions from the perspective of project management. Polish Journal of Management Studies, 15(2), 100-114.10.17512/pjms.2017.15.2.10Search in Google Scholar

Janićijević, N. (2017). Organizational Models as Configuration of Structure, Culture, Leadership, Control and Change Strategy. Economic Annals, LXII(213), 67-91.10.2298/EKA1713067JSearch in Google Scholar

Jigeesh, N., & Rao, N. S. N. (2015). Analysis and control of issues that delay pharmaceutical projects. Business: Theory and Practice, 16(3), 252-263. doi: 10.3846/btp.2015.49110.3846/btp.2015.491Search in Google Scholar

Knol, W. H., Slomp, J., Schouteten, R. L., & Lauche, K. (2018). Implementing lean practices in manufacturing SMEs: testing ‘critical success factors’ using Necessary Condition Analysis. International Journal of Production Research, 56(11), 3955-3973.10.1080/00207543.2017.1419583Search in Google Scholar

Kuchta, D., Klaus-Rosińska, A., Ropuszyńska-Surma, E., & Walecka-Jankowska, K. (2017). Threats to research projects across the project life cycle. Forum Scientiae Oeconomia, 5(3), 71-87. doi: 10.23762/FSO_vol-5no3_17_5Search in Google Scholar

Lee, T. R., & Mouritsen, S. C. (2018). Judging Ordinary Meaning. The Yale Law Journal, 1(1),788-879.Search in Google Scholar

Lindahl, G., & Ryd, N. (2007). Clients’ goals and the construction project management process. Emerald Group Publishing Limited, 25(3/4), 147-156.10.1108/02632770710729737Search in Google Scholar

Liu, L. (2020). Research on Performance and Decision-making Method of Project Management Mode. IOP Conference Series: Earth and Environmental Science, 526(1), 01-07.10.1088/1755-1315/526/1/012219Search in Google Scholar

Mahdi, I. M., Ebid, A. M., & Khallaf, R. (2020). Decision support system for optimum soft clay improvement technique for highway construction projects. Ain Shams Engineering Journal, 11(1), 213-223.10.1016/j.asej.2019.08.007Search in Google Scholar

Maslach, D., Branzei, O., Rerup, C., & Zbaracki, M. J. (2018). Noise as signal in learning from rare events. Organization Science, 29(2), 225-246.10.1287/orsc.2017.1179Search in Google Scholar

Mosly, I. (2016). Construction Project Delivery System Selection Framework: Professional Service Firms’ Perspective. Journal of Civil Engineering and Architecture, 10(1), 368-378.10.17265/1934-7359/2016.03.012Search in Google Scholar

Mukhtar, M., Sudarmi, S., Wahyudi, M., & Burmansah, B. (2020). The Information System Development Based on Knowledge Management in Higher Education Institution. International Journal of Higher Education, 9(3), 98-108.10.5430/ijhe.v9n3p98Search in Google Scholar

Nijhuis, S., Vrijhoef, R., & Kessels, J. (2018). Tackling Project Management Competence Research. Project Management Journal, 49(3), 62-81.10.1177/8756972818770591Search in Google Scholar

Ogbeifun E. (2018). Performance management as a tool for performance improvement in the management of built facilities. Journal of Construction Project Management and Innovation, 8(2), 1852-1871.Search in Google Scholar

Ogbeifun E., Mbohwa, C., & Pretorius, J. H. C. (2018). Fragmentation of capital development projects: A tool for job creation and skill development. Proceedings of the 34th Conference of the Association of Researchers in Construction Management (ARCOM), Belfast, UK, 717-726.Search in Google Scholar

Ogbeifun, E., Mbohwa, C., & Pretorius, J. H. C. (2016). Complementing a Delphi Exercise with a Focus Group Session. Proceedings of the 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), Bali, Indonesia, 1269-1273.10.1109/IEEM.2016.7798082Search in Google Scholar

Ogbeifun, E., Mbohwa, C., & Pretorius, J. H. C. (2016a). Developing Key Performance Indicators using the Delphi Technique. FUTY Journal of the Environment, 10(1), 27-38.Search in Google Scholar

Ogbeifun, E., Mbohwa, C., & Pretorius, J. H. C. (2017). Achieving Consensus Devoid of Complicity: Adopting the Delphi Technique. International Journal of Productivity and Performance Management, 66(6), 766-779.10.1108/IJPPM-08-2015-0112Search in Google Scholar

Okwir, S., Nudurupati, S. S., Ginieis, M., & Angelis, J. (2018). Performance measurement and management systems: a perspective from complexity theory. International Journal of Management Reviews, 20(3), 731-754.10.1111/ijmr.12184Search in Google Scholar

Oun, T. A. (2016). The Association of Knowledge Management and Project Management: An Enterprise-wide Approach Based on Stankosky’s Four Pillar of Knowledge Management and PMI’s Project Management Knowledge Areas. ProQuest Dissertations & Theses Global.Search in Google Scholar

Pal, R., Wang, P., & Liang, X. (2017). The critical factors in managing relationships in international engineering, procurement, and construction (IEPC) projects of Chinese organizations. International Journal of Project Management, 35(7), 1225-1237.10.1016/j.ijproman.2017.05.010Search in Google Scholar

Pourrashidi, R., Mehranpour, M., & Nick, M. F. (2017). Human resources management: challenges and solutions. Helix, 8, 998-1001.Search in Google Scholar

Rao, B. P. (2016). Delay Analysis of Construction Projects. Journal of IT and Economic Development, 7(1), 15-24.Search in Google Scholar

Reefke, H., & Sundaram, D. (2017). Key themes and research opportunities in sustainable supply chain management–identification and evaluation. Omega, 66(1), 195-211.10.1016/j.omega.2016.02.003Search in Google Scholar

Rodriguez-Labajos, L., Thomson, C., & O’Brien, G. (2016). Exploring the attributes and KPI’s adopted by international healthcare providers to measure the performance of their estates at the strategic level. In Proceedings of the 32nd Annual ARCOM Conference, 2(1), 1213-1223.Search in Google Scholar

Rosa, A. C. M., & Broday, E. E. (2018). Comparative analysis between the industrial and service sectors: a literature review of the improvements obtained through the application of lean six sigma. International Journal for Quality Research, 12(1), 227-252.Search in Google Scholar

Saunila, M. (2017). Understanding innovation performance measurement in SMEs. Measuring Business Excellence, 21(1), 1-16.10.1108/MBE-01-2016-0005Search in Google Scholar

Shao, Z., Feng, Y., & Hu, Q. (2017). Impact of top management leadership styles on ERP assimilation and the role of organizational learning. Information & Management, 54(7), 902-919.10.1016/j.im.2017.01.005Search in Google Scholar

Sharma, S. P. (2017). US Government Program Managers’ Competencies to Manage Satellite Acquisition Programs. Doctoral dissertation, Northcentral University.Search in Google Scholar

Shaw, T. (2018). Sustainable Leadership: A Delphi Study. ProQuest LLC.Search in Google Scholar

Shohet, I. M., & Nobili, L. (2017). Application of key performance indicators for maintenance management of clinics facilities. International Journal of Strategic Property Management, 21(1), 58-7.10.3846/1648715X.2016.1245684Search in Google Scholar

Sierra-Varela, L. A., Yepes, V., & Pellicer, E. (2018). A Review of Multi-Criteria Assessment of the Social Sustainability of Infrastructures. Journal of Cleaner Production, 187(1), 496-513.10.1016/j.jclepro.2018.03.022Search in Google Scholar

Solomon, O. B., Adeniyi, O., & Oluwaseyi, A. A. (2017). Investigation into the Causes of Delay in Land Acquisition for PPP Projects in Developing Countries. Journal of Engineering, Design and Technology, 15(4), 552-570.10.1108/JEDT-05-2016-0029Search in Google Scholar

Strasser, A. (2017). Delphi method variants in information systems research: Taxonomy development and application. Electronic Journal of Business Research Methods, 15(2), 120-133.Search in Google Scholar

Szpilko, D. (2020). Foresight as a Tool for the Planning and Implementation of Visions for Smart City Development. Energies, 13(7), 1782. doi:10.3390/en1307178210.3390/en13071782Search in Google Scholar

Tan, Y., Xue, B., & Cheung, Y. T. (2017). Relationships between main contractors and subcontractors and their impacts on main contractor competitiveness: An empirical study in Hong Kong. Journal of Construction Engineering and Management, 143(7), 01-12.10.1061/(ASCE)CO.1943-7862.0001311Search in Google Scholar

The Oak Ridge Associated Universities. Retrieved fromhttps://www.orau.gov/Search in Google Scholar

Varga-Atkins, T., McIsaac, J., & Willis, I. (2017). Focus Group meets Nominal Group Technique: an effective combination for student evaluation? Innovations in Education and Teaching International, 54(4), 289-300.10.1080/14703297.2015.1058721Search in Google Scholar

Yap, J. B. H., & Skitmore, M. (2018). Investigating design changes in Malaysian building projects. Architectural Engineering and Design Management, 14(3), 218-238.10.1080/17452007.2017.1384714Search in Google Scholar

Zadeh, M. T., Dehghan, R., Ruwanpura, J. Y., Jerge, G., & Ahadzie, D. (2016). An Index to Assess Project Management Competencies in Managing Design Changes. International Journal of Construction Engineering and Management, 5(1), 11-24.Search in Google Scholar