Cite

Al-Hawari, S., Thabtah, F., Karadsheh, L., & Hadi, W. M. (2008). A risk management model for project execution. In: Proceedings of the 9th International Business Information Management Association conference (IBIMA), Conference on Information Management in Modern Organizations: Trends & Challenges, Marrakech, Morocco, pp. 887–893. Al-HawariS. ThabtahF. KaradshehL. HadiW. M. 2008 A risk management model for project execution In: Proceedings of the 9th International Business Information Management Association conference (IBIMA), Conference on Information Management in Modern Organizations: Trends & Challenges Marrakech, Morocco 887 893 Search in Google Scholar

Association for Project Management. (2018). Project risk analysis & management (PRAM) mini guide. UK, Available at https://www.apm.org.uk/media/10466/pram_web.pdf/ [accessed 15 March, 2022]. Association for Project Management 2018 Project risk analysis & management (PRAM) mini guide UK Available at https://www.apm.org.uk/media/10466/pram_web.pdf/ [accessed 15 March, 2022]. Search in Google Scholar

Aven, T., & Heide, B. (2009). Reliability and validity of risk analysis. Reliability Engineering and System Safety, 94(11), pp. 1862–1868. doi: 10.1016/j.ress.2009.06.003. AvenT. HeideB. 2009 Reliability and validity of risk analysis Reliability Engineering and System Safety 94 11 1862 1868 10.1016/j.ress.2009.06.003 Open DOISearch in Google Scholar

Banaitiene, N., & Banaitis, A. (2012). Risk management in construction projects. In: Banaitiene, N. (ed.), Risk Management–Current Issues and Challenges. InTech, Croatia, pp. 429–448. doi: 10.5772/51460. BanaitieneN. BanaitisA. 2012 Risk management in construction projects In: BanaitieneN. (ed.), Risk Management–Current Issues and Challenges InTech Croatia 429 448 10.5772/51460 Open DOISearch in Google Scholar

Bissonette, M. M. (2016). Project Risk Management: A Practical Implementation Approach. Project Management Institute, Newtown Square, Pennsylvania. BissonetteM. M. 2016 Project Risk Management: A Practical Implementation Approach Project Management Institute, Newtown Square Pennsylvania Search in Google Scholar

Choudhry, R. M., & Iqbal, K. (2013). Identification of risk management system in construction industry in Pakistan. Journal of Management in Engineering, 29(1), pp. 42–49. doi: 10.1061/(ASCE)ME.1943-5479.0000122. ChoudhryR. M. IqbalK. 2013 Identification of risk management system in construction industry in Pakistan Journal of Management in Engineering 29 1 42 49 10.1061/(ASCE)ME.1943-5479.0000122 Open DOISearch in Google Scholar

Cooper, D. F., Grey, S., Raymond, G., & Walker, P. (2005). Project Risk Management Guidelines: Managing Risk in Large Projects and Complex Procurements. John Wiley & Sons Ltd, Chichester, West Sussex, England. CooperD. F. GreyS. RaymondG. WalkerP. 2005 Project Risk Management Guidelines: Managing Risk in Large Projects and Complex Procurements John Wiley & Sons Ltd Chichester, West Sussex, England Search in Google Scholar

Dikmen, I., Birgonul, M. T., & Han, S. (2007). Using fuzzy risk assessment to rate cost overrun risk in international construction projects. International Journal of Project Management, 25(5), pp. 494–505. doi: 10.1016/j.ijproman.2006.12.002. DikmenI. BirgonulM. T. HanS. 2007 Using fuzzy risk assessment to rate cost overrun risk in international construction projects International Journal of Project Management 25 5 494 505 10.1016/j.ijproman.2006.12.002 Open DOISearch in Google Scholar

Ebrahimia, M., Asadia, M., Akbarib, H., & Shakeric, A. (2012). Petrochemical industries and the opportunities provided by effective risk management: A case study. In: 26th IPMA World Congress, Crete, Greece. EbrahimiaM. AsadiaM. AkbaribH. ShakericA. 2012 Petrochemical industries and the opportunities provided by effective risk management: A case study In: 26th IPMA World Congress Crete, Greece Search in Google Scholar

El-Sayegh, S. M. (2008). Risk assessment and allocation in the UAE construction industry. International Journal of Project Management, 26(4), pp. 431–438. doi: 10.1016/j.ijproman.2007.07.004. El-SayeghS. M. 2008 Risk assessment and allocation in the UAE construction industry International Journal of Project Management 26 4 431 438 10.1016/j.ijproman.2007.07.004 Open DOISearch in Google Scholar

El-Sayegh, S. M., & Mansour, M. H. (2015). Risk assessment and allocation in highway construction projects in the UAE. Journal of Management in Engineering, 31(6), p. 04015004. doi: 10.1061/(ASCE)ME.1943-5479.0000365. El-SayeghS. M. MansourM. H. 2015 Risk assessment and allocation in highway construction projects in the UAE Journal of Management in Engineering 31 6 04015004 10.1061/(ASCE)ME.1943-5479.0000365 Open DOISearch in Google Scholar

Fenz, S., & Ekelhart, A. (2011). Verification, validation, and evaluation in information security risk management. IEEE Security and Privacy, 9(2), pp. 58–65. doi: 10.1109/MSP.2010.117. FenzS. EkelhartA. 2011 Verification, validation, and evaluation in information security risk management IEEE Security and Privacy 9 2 58 65 10.1109/MSP.2010.117 Open DOISearch in Google Scholar

Institute of Risk Management (2018). Standard Deviations A Risk Practitioners Guide to ISO 31000. London, Available at https://www.theirm.org/media/6884/irm-report-iso-31000-2018-v2.pdf/ [accessed 15 March, 2022]. Institute of Risk Management 2018 Standard Deviations A Risk Practitioners Guide to ISO 31000 London Available at https://www.theirm.org/media/6884/irm-report-iso-31000-2018-v2.pdf/ [accessed 15 March, 2022]. Search in Google Scholar

Institute of Risk Management. (2002). A Risk Management Standard. London, Available at https://www.theirm.org/what-we-do/what-is-enterprise-risk-management/irms-risk-management-standard/ [accessed 10 December, 2020]. Institute of Risk Management 2002 A Risk Management Standard London Available at https://www.theirm.org/what-we-do/what-is-enterprise-risk-management/irms-risk-management-standard/ [accessed 10 December, 2020]. Search in Google Scholar

Jarkas, A. M., & Haupt, T. C. (2015). Major construction risk factors considered by general contractors in Qatar. Journal of Engineering, Design and Technology, 13(1), pp. 165–194. doi: 10.1108/JEDT-03-2014-0012. JarkasA. M. HauptT. C. 2015 Major construction risk factors considered by general contractors in Qatar Journal of Engineering, Design and Technology 13 1 165 194 10.1108/JEDT-03-2014-0012 Open DOISearch in Google Scholar

Kayis, B., Zhou, M., Savci, S., Khoo, Y. B., Ahmed, A., & Kusumo, R., et al. (2007). IRMAS – Development of a risk management tool for collaborative multi-site, multi-partner new product development projects. Journal of Manufacturing Technology Management, 18(4), pp. 387–414. doi: 10.1108/17410380710743770. KayisB. ZhouM. SavciS. KhooY. B. AhmedA. KusumoR. 2007 IRMAS – Development of a risk management tool for collaborative multi-site, multi-partner new product development projects Journal of Manufacturing Technology Management 18 4 387 414 10.1108/17410380710743770 Open DOISearch in Google Scholar

Kendrick, T. (2003). Identifying and Managing Project Risk: Essential Tools for Failure-Proofing Your Project. American Management Association, United States. KendrickT. 2003 Identifying and Managing Project Risk: Essential Tools for Failure-Proofing Your Project American Management Association United States Search in Google Scholar

Kuo, Y. C., & Lu, S. T. (2013). Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects. International Journal of Project Management, 31(4), pp. 602–614. doi: 10.1016/j.ijproman.2012.10.003. KuoY. C. LuS. T. 2013 Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects International Journal of Project Management 31 4 602 614 10.1016/j.ijproman.2012.10.003 Open DOISearch in Google Scholar

Lathrop, J., & Ezell, B. (2017). A systems approach to risk analysis validation for risk management. Safety Science, 99, pp. 187–195. doi: 10.1016/j.ssci.2017.04.006. LathropJ. EzellB. 2017 A systems approach to risk analysis validation for risk management Safety Science 99 187 195 10.1016/j.ssci.2017.04.006 Open DOISearch in Google Scholar

Lin, W., Yaqi, L., & Enmao, W. (2011). Research on risk management of railway engineering construction. Systems Engineering Procedia, 1, pp. 174–180. doi: 10.1016/j.sepro.2011.08.029. LinW. YaqiL. EnmaoW. 2011 Research on risk management of railway engineering construction Systems Engineering Procedia 1 174 180 10.1016/j.sepro.2011.08.029 Open DOISearch in Google Scholar

Mubarak, S. A. (2010). Construction Project Scheduling and control, 2nd edn. John Wiley & Sons Inc, Hoboken, NJ. MubarakS. A. 2010 Construction Project Scheduling and control 2nd edn. John Wiley & Sons Inc Hoboken, NJ 10.1002/9780470912171 Search in Google Scholar

Nieto-Morote, A., & Ruz-Vila, F. (2011). A fuzzy approach to construction project risk assessment. International Journal of Project Management, 29(2), pp. 220–231. doi: 10.1016/j.ijproman.2010.02.002. Nieto-MoroteA. Ruz-VilaF. 2011 A fuzzy approach to construction project risk assessment International Journal of Project Management 29 2 220 231 10.1016/j.ijproman.2010.02.002 Open DOISearch in Google Scholar

Perera, J., & Holsomback, J. (2005). An integrated risk management tool and process. In: IEEE Aerospace Conference Proceedings, Big Sky, MT. USA, pp. 129–136. doi: 10.1109/AERO.2005.1559306. PereraJ. HolsombackJ. 2005 An integrated risk management tool and process In: IEEE Aerospace Conference Proceedings, Big Sky, MT USA 129 136 10.1109/AERO.2005.1559306 Open DOISearch in Google Scholar

Project Management Institute. (2017). Project Management Book of Knowledge, 6th edn. Newtown Square, PA, USA. Project Management Institute 2017 Project Management Book of Knowledge 6th edn. Newtown Square PA, USA Search in Google Scholar

Serpell, A. F., Ferrada, X., & Rubio, L. (2019). Measuring the performance of project risk management: A preliminary model. Organization, Technology and Management in Construction: An International Journal, 11(1), pp. 1984–1991. doi: 10.2478/otmcj-2019-0005. SerpellA. F. FerradaX. RubioL. 2019 Measuring the performance of project risk management: A preliminary model Organization, Technology and Management in Construction: An International Journal 11 1 1984 1991 10.2478/otmcj-2019-0005 Open DOISearch in Google Scholar

Suokas, J. (1985). On the reliability and validity of safety analysis: Dissertation. Tampere University of Technology, Available at https://cris.vtt.fi/en/publications/on-the-reliability-and-validity-of-safety-analysis-dissertation. SuokasJ. 1985 On the reliability and validity of safety analysis: Dissertation Tampere University of Technology Available at https://cris.vtt.fi/en/publications/on-the-reliability-and-validity-of-safety-analysis-dissertation. Search in Google Scholar

Yildiz, A. E., Dikmen, I., Birgonul, M. T., Ercoskun, K., & Alten, S. (2014). A knowledge-based risk mapping tool for cost estimation of international construction projects. Automation in Construction, 43, pp. 144–155. doi: 10.1016/j.autcon.2014.03.010. YildizA. E. DikmenI. BirgonulM. T. ErcoskunK. AltenS. 2014 A knowledge-based risk mapping tool for cost estimation of international construction projects Automation in Construction 43 144 155 10.1016/j.autcon.2014.03.010 Open DOISearch in Google Scholar

Zhao, Z. Y., & Duan, L. L. (2008). An integrated risk management model for construction projects. In: PICMET: Portland International Conference on Management of Engineering & Technology. IEEE, pp. 1389–1394. doi: 10.1109/PICMET.2008.4599751. ZhaoZ. Y. DuanL. L. 2008 An integrated risk management model for construction projects In: PICMET: Portland International Conference on Management of Engineering & Technology IEEE 1389 1394 10.1109/PICMET.2008.4599751 Open DOISearch in Google Scholar

Zhi, H. (1995). Risk management for overseas construction projects. International Journal of Project Management, 13(4), pp. 231–237. doi: 10.1016/0263-7863(95)00015-I. ZhiH. 1995 Risk management for overseas construction projects International Journal of Project Management 13 4 231 237 10.1016/0263-7863(95)00015-I Open DOISearch in Google Scholar

Zou, P. X. W., Zhang, G., & Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6), pp. 601–614. doi: 10.1016/j.ijproman.2007.03.001. ZouP. X. W. ZhangG. WangJ. 2007 Understanding the key risks in construction projects in China International Journal of Project Management 25 6 601 614 10.1016/j.ijproman.2007.03.001 Open DOISearch in Google Scholar

eISSN:
1847-6228
Language:
English
Publication timeframe:
Volume Open
Journal Subjects:
Engineering, Introductions and Overviews, other