This work is licensed under the Creative Commons Attribution 4.0 International License.
Ahmed, A. L., & Kassem, M. (2018). A unified BIM adoption taxonomy: Conceptual development, empirical validation and application. Automation in Construction, 96, pp. 102-127. doi: 10.1016/j.autcon.2018.08.017.AhmedA. L. & KassemM.(2018).A unified BIM adoption taxonomy: Conceptual development, empirical validation and application.Automation in Construction,96, pp.102-127. doi:10.1016/j.autcon.2018.08.017.Open DOISearch in Google Scholar
Alwisy, A., Al-Hussein, M., & Al-Jibouri, S. H. (2014). BIM approach for automated drafting and design for modular construction manufacturing. In: Proceedings of the Computing in Civil Engineering 2012. 2012 June 17–20. American Society of Civil Engineers, Clearwater Beach, FL, USA, pp. 221-228. doi: 10.1061/9780784412343.0028.AlwisyA.Al-HusseinM. & Al-JibouriS. H.(2014).BIM approach for automated drafting and design for modular construction manufacturing. In:Proceedings of the Computing in Civil Engineering 2012. 2012 June 17–20.American Society of Civil Engineers,Clearwater Beach, FL, USA, pp.221-228. doi:10.1061/9780784412343.0028.Open DOISearch in Google Scholar
Anderson, D. J. (2009). Kanban esencial condensado. Great Book Princes, Columbia.AndersonD. J.(2009).Kanban esencial condensado.Great Book Princes,Columbia.Search in Google Scholar
Barrett, P., & Sexton, M. G. (1998). Integrating to Innovate: Report for the Construction Industry Council. Construction Industry Council/Department of the Environment, Transport and the Regions, London.BarrettP. & SextonM. G.(1998).Integrating to Innovate: Report for the Construction Industry Council.Construction Industry Council/Department of the Environment, Transport and the Regions,London.Search in Google Scholar
Berard, O., & Karlshoej, J. (2012). Information delivery manuals to integrate building product information into design. Journal of Information Technology in Construction (ITcon), 17, pp. 63-74.BerardO. & KarlshoejJ.(2012).Information delivery manuals to integrate building product information into design.Journal of Information Technology in Construction (ITcon),17, pp.63-74.Search in Google Scholar
Bi, X., & Jia, Xm. (2016). Research on the integration of lean construction and BIM and a case study in Shanghai tower project. In: Qi, E. (ed.), Proceedings of the 6th International Asia Conference on Industrial Engineering and Management Innovation. Atlantis Press, Paris. doi: 10.2991/978-94-6239-145-1_101.BiX. & JiaXm.(2016).Research on the integration of lean construction and BIM and a case study in Shanghai tower project. In:QiE.(ed.),Proceedings of the 6th International Asia Conference on Industrial Engineering and Management Innovation.Atlantis Press, Paris. doi:10.2991/978-94-6239-145-1_101.Open DOISearch in Google Scholar
Chavada, R., Dawood, N., & Kassem, M. (2012). Construction workspace management: The development and application of a novel nD planning approach and tool. Journal of Information Technology in Construction (ITcon), 17, pp. 213-236, Available at http://www.itcon.org/2012/13. [accessed 12 January, 2022].ChavadaR.DawoodN. & KassemM.(2012).Construction workspace management: The development and application of a novel nD planning approach and tool.Journal of Information Technology in Construction (ITcon),17, pp.213-236, Available at http://www.itcon.org/2012/13. [accessed 12 January, 2022].Search in Google Scholar
Dainty, A., Leiringer, R., Fernie, S., & Harty, C. (2017). BIM and the small construction firm: A critical perspective. Building Research and Information, 45(6), pp. 696-709. doi: 10.1080/09613218.2017.1293940.DaintyA.LeiringerR.FernieS. & HartyC.(2017).BIM and the small construction firm: A critical perspective.Building Research and Information,45(6), pp.696-709. doi:10.1080/09613218.2017.1293940.Open DOISearch in Google Scholar
Ding, L., Zhou, Y., & Akinci, B. (2014). Building information modeling (BIM) application framework: The process of expanding from 3D to computable nD. Automation in Construction, 46, pp. 82-93.DingL.ZhouY. & AkinciB.(2014).Building information modeling (BIM) application framework: The process of expanding from 3D to computable nD.Automation in Construction,46, pp.82-93.Search in Google Scholar
Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors, 2nd edn. John Wiley & Sons, Inc., New Jersey.EastmanC.TeicholzP.SacksR. & ListonK.(2011).BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors,2nd edn.John Wiley & Sons, Inc.,New Jersey.Search in Google Scholar
Elmualim, J., & Gilder, J. (2014). BIM: Innovation in design management, influence and challenges of implementation. Architectural Engineering and Design Management, 10(3-4), pp. 183-199. doi: 10.1080/17452007.2013.821399.ElmualimJ. & GilderJ.(2014).BIM: Innovation in design management, influence and challenges of implementation.Architectural Engineering and Design Management,10(3-4), pp.183-199. doi:10.1080/17452007.2013.821399.Open DOISearch in Google Scholar
Flager, F., & Haymaker, J. A. (2007). Comparison of multidisciplinary design, analysis and optimization processes in the building construction and aerospace industries. In: Proceedings of the 24th International Conference on Information Technology in Construction, Slovenia, pp. 625-630.FlagerF. & HaymakerJ. A.(2007).Comparison of multidisciplinary design, analysis and optimization processes in the building construction and aerospace industries. In:Proceedings of the 24th International Conference on Information Technology in Construction,Slovenia, pp.625-630.Search in Google Scholar
GhaffarianHoseini, A., Tookey, J., & GhaffarianHoseini, A. H. (2017). Application of nD BIM integrated knowledge-based building management system (BIM-IKBMS) for inspecting the post-construction energy efficiency. Renewable and Sustainable Energy Reviews, 72, pp. 935-949.GhaffarianHoseiniA.TookeyJ. & GhaffarianHoseiniA. H.(2017).Application of nD BIM integrated knowledge-based building management system (BIM-IKBMS) for inspecting the post-construction energy efficiency.Renewable and Sustainable Energy Reviews,72, pp.935-949.Search in Google Scholar
Gigante-Barrera, A., Ruikar D., Crunden, M., & Ruikar, K. (2017). LOD object content specification for manufacturers within the UK using the IDM standard. Journal of Information Technology in Construction (ITcon), 22, pp. 80-103, Available at http://www.itcon.org/2017/5. [accessed 12 January, 2022].Gigante-BarreraA.RuikarD.CrundenM. & RuikarK.(2017).LOD object content specification for manufacturers within the UK using the IDM standard.Journal of Information Technology in Construction (ITcon),22, pp.80-103, Available at http://www.itcon.org/2017/5. [accessed 12 January, 2022].Search in Google Scholar
Guo, J., Teng, J. Y., Li, S. Q., Wan, D. Y., & Jiang, X. (2012). Study on electronic Kanban management system in steel structure engineering of an international Expo Centre. Advanced Materials Research, 621, pp. 375-380.GuoJ.TengJ. Y.LiS. Q.WanD. Y. & JiangX.(2012).Study on electronic Kanban management system in steel structure engineering of an international Expo Centre.Advanced Materials Research,621, pp.375-380.Search in Google Scholar
Harty, C. (2008). Implementing innovation in construction: Contexts, relative boundedness and actor-network theory. Construction Management and Economics, 26(10), pp. 1029-1041.HartyC.(2008).Implementing innovation in construction: Contexts, relative boundedness and actor-network theory.Construction Management and Economics,26(10), pp.1029-1041.Search in Google Scholar
Jang, J., & Kim, Y. (2007). Using Kanban for construction production and safety control. In: Proceedings of the 15th Annual Conference of the International Group for Lean Construction (IGLC), MI.JangJ. & KimY.(2007).Using Kanban for construction production and safety control. In:Proceedings of the 15th Annual Conference of the International Group for Lean Construction (IGLC),MI.Search in Google Scholar
Kamardeen, I. (2010). 8D BIM modelling tool for accident prevention through design. Proceedings of the 26th Annual Conference. 6-8 September 2010, Leeds, UK, Association of Researchers in Construction Management ARCOM, pp. 281-289.KamardeenI.(2010).8D BIM modelling tool for accident prevention through design.Proceedings of the 26th Annual Conference.6-8 September 2010,Leeds, UK, Association of Researchers in Construction Management ARCOM, pp.281-289.Search in Google Scholar
Ko, C. H., & Kuo, J. D. (2015). Making formwork construction lean. Journal of Civil Engineering and Management, 21(4), pp. 444-458. doi: 10.3846/13923730.2014.890655.KoC. H. & KuoJ. D.(2015).Making formwork construction lean.Journal of Civil Engineering and Management,21(4), pp.444-458. doi:10.3846/13923730.2014.890655.Open DOISearch in Google Scholar
Koskela, L. (1992). Application of the New Philosophy to Construction. CIFE Technical Report 71. Stanford University. Available at https://stacks.stanford.edu/file/druid:kh328xt3298/TR072.pdfKoskelaL.(1992).Application of the New Philosophy to Construction. CIFE Technical Report 71.Stanford University. Available at https://stacks.stanford.edu/file/druid:kh328xt3298/TR072.pdfSearch in Google Scholar
Koutamanis, A. (2020). Dimensionality in BIM: Why BIM cannot have more than four dimensions? Automation in Construction, 114, p. 103153. doi: 10.1016/j.autcon.2020.103153.KoutamanisA.(2020).Dimensionality in BIM: Why BIM cannot have more than four dimensions?Automation in Construction,114, p.103153. doi:10.1016/j.autcon.2020.103153.Open DOISearch in Google Scholar
Loredo Conde, A. J. (2016). Aplicación de sistemas BIM y fotogrametría en implantación de modelos de franquicias. Universidad de Extremadura, España.Loredo CondeA. J.(2016).Aplicación de sistemas BIM y fotogrametría en implantación de modelos de franquicias.Universidad de Extremadura,España.Search in Google Scholar
Mahamadu, A., Mahdjoubi, L., & Booth, C. A. (2017). Critical BIM qualification criteria for construction pre-qualification and selection. Architectural Engineering and Design Management, 13(5), pp. 326-343.MahamaduA.MahdjoubiL. & BoothC. A.(2017).Critical BIM qualification criteria for construction pre-qualification and selection.Architectural Engineering and Design Management,13(5), pp.326-343.Search in Google Scholar
Mayouf, M., Gerges, M., & Cox, S. (2019). 5D BIM: An investigation into the integration of quantity surveyors within the BIM process. Journal of Engineering, Design and Technology, 13(3), pp. 537-553.MayoufM.GergesM. & CoxS.(2019).5D BIM: An investigation into the integration of quantity surveyors within the BIM process.Journal of Engineering, Design and Technology,13(3), pp.537-553.Search in Google Scholar
Mesároš, P., Smetanková, J., & Mandičák, T. (2019). The fifth dimension of BIM–implementation survey. IOP Conference Series: Earth and Environmental Science, 222, p. 012003.MesárošP.SmetankováJ. & MandičákT.(2019).The fifth dimension of BIM–implementation survey.IOP Conference Series: Earth and Environmental Science,222, p. 012003.Search in Google Scholar
Muñoz, S., & Roig, V. (2018). Estudio Marco de la adopción BIM en España. Building Smart Spain 2018. BIM Initiative, Available at www.buildingsmart.es/observatorio-bim/estudios/macro-estudio-adopci%C3%B3n-bim/ [accessed 20 marzo, 2021].MuñozS. & RoigV.(2018).Estudio Marco de la adopción BIM en España.Building Smart Spain 2018.BIM Initiative, Available at www.buildingsmart.es/observatorio-bim/estudios/macro-estudio-adopci%C3%B3n-bim/[accessed 20 marzo, 2021].Search in Google Scholar
Oti, A. H., Tizani, W., Abanda, F. H., Jaly-Zada, A., & Tah, J. H. M. (2016). Structural sustainability appraisal in BIM. Automation in Construction, 69, pp. 44-58.OtiA. H.TizaniW.AbandaF. H.Jaly-ZadaA. & TahJ. H. M.(2016).Structural sustainability appraisal in BIM.Automation in Construction,69, pp.44-58.Search in Google Scholar
Plume, J., & Mitchell, J. (2007). Collaborative design using a shared IFC building model–Learning from experience. Automation in Construction, 16(1), pp. 28-36.PlumeJ. & MitchellJ.(2007).Collaborative design using a shared IFC building model–Learning from experience.Automation in Construction,16(1), pp.28-36.Search in Google Scholar
Pons Achell, J. F. (2017). Introducción a lean construction. Fundación Laboral de la Construcción. Available at https://www.researchgate.net/publication/275654575_Introduccion_a_ Lean_Construction [accessed 6 marzo, 2022].Pons AchellJ. F.(2017).Introducción a lean construction.Fundación Laboral de la Construcción. Available at https://www.researchgate.net/publication/275654575_Introduccion_a_Lean_Construction[accessed 6 marzo, 2022].Search in Google Scholar
Pons Achell, J. F., & Rubio, I. (2019). Metodología del Last Planner System (LPS). Consejo General de la Arquitectura Técnica de España (CGATE), Pg. 15, 77-86. Available at www.cgate.es/pdf/LEAN%20CONSTRUCTION%20PDF%20Web.pdf [accessed 7 marzo, 2022].Pons AchellJ. F. & RubioI.(2019).Metodología del Last Planner System (LPS).Consejo General de la Arquitectura Técnica de España (CGATE), Pg.15,77-86. Available at www.cgate.es/pdf/LEAN%20CONSTRUCTION%20PDF%20Web.pdf[accessed 7 marzo, 2022].Search in Google Scholar
Qiaolan, J., & Bin, Z. (2021). Civil engineering construction management based on BIM technology. Forest Chemicals Review, p. 31. doi: 10.17762/jfcr.vi.47.QiaolanJ. & BinZ.(2021).Civil engineering construction management based on BIM technology.Forest Chemicals Review, p.31. doi:10.17762/jfcr.vi.47.Open DOISearch in Google Scholar
Sacks, R., & Barak, R. (2008). Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice. Automation in Construction, 17(4), pp. 439-449. doi: 10.1016/j.autcon.2007.08.003.SacksR. & BarakR.(2008).Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice.Automation in Construction,17(4), pp.439-449. doi:10.1016/j.autcon.2007.08.003.Open DOISearch in Google Scholar
Schimanski, C. P., Pasetti Monizza, G., Marcher, C., & Matt, D. T. (2021). Development of a BIM-based production planning and control system for Lean Construction through advancement and integration of existing management techniques. Frontiers of Engineering Management, 8, pp. 429-441. doi: 10.1007/ s42524-020-0105-5.SchimanskiC. P.Pasetti MonizzaG.MarcherC. & MattD. T.(2021).Development of a BIM-based production planning and control system for Lean Construction through advancement and integration of existing management techniques.Frontiers of Engineering Management,8, pp.429-441. doi:10.1007/s42524-020-0105-5.Open DOISearch in Google Scholar
Shafiq, M. T., Matthews, J., & Lockley, S. R. (2013). A study of BIM collaboration requirements and available features in existing model collaboration systems. Journal of Information Technology in Construction (ITcon), 18, pp. 148-161.ShafiqM. T.MatthewsJ. & LockleyS. R.(2013).A study of BIM collaboration requirements and available features in existing model collaboration systems.Journal of Information Technology in Construction (ITcon),18, pp.148-161.Search in Google Scholar
Staub-French, S., & Khanzode, A. (2007). 3D and 4D modeling for design and construction coordination: Issues and lessons learned. Journal of Information Technology in Construction (ITcon), 12, pp. 381-407, Available at https://www.itcon.org/2007/26. [accessed 14 January, 2022].Staub-FrenchS. & KhanzodeA.(2007).3D and 4D modeling for design and construction coordination: Issues and lessons learned.Journal of Information Technology in Construction (ITcon),12, pp.381-407, Available at https://www.itcon.org/2007/26. [accessed 14 January, 2022].Search in Google Scholar
Sudarsan, R., Fenves, S., Sriram, R., & Wang, F. (2005). A product information modeling framework for product lifecycle management. Computer Aided Design, 37(13), pp. 1399-1411.SudarsanR.FenvesS.SriramR. & WangF.(2005).A product information modeling framework for product lifecycle management.Computer Aided Design,37(13), pp.1399-1411.Search in Google Scholar
Tezel, A., Koskela, L., & Aziz, Z. (2017). Lean thinking in the highways construction sector: Motivation, implementation and barriers. Production Planning and Control, 29(3). doi: 10.1080/09537287.2017.1412522.TezelA.KoskelaL. & AzizZ.(2017).Lean thinking in the highways construction sector: Motivation, implementation and barriers.Production Planning and Control,29(3). doi:10.1080/09537287.2017.1412522.Open DOISearch in Google Scholar
Tommelein, I. D., & Gholami, S. (2012). Root causes of clashes in building information models. In: Proceedings of IGLC20: 20th Annual Conference of the International Group on Lean Construction, 2012 July 18–20, San Diego, CA, USA.TommeleinI. D. & GholamiS.(2012).Root causes of clashes in building information models. In:Proceedings of IGLC20: 20th Annual Conference of the International Group on Lean Construction,2012 July 18–20,San Diego, CA, USA.Search in Google Scholar
Weirui, X., Yaow, W., & Qingpeng, M. (2015). Research on information models for the construction schedule management based on the IFC standard. Journal of Industrial Engineering and Management, 8, pp. 615-635.WeiruiX.YaowW. & QingpengM.(2015).Research on information models for the construction schedule management based on the IFC standard.Journal of Industrial Engineering and Management,8, pp.615-635.Search in Google Scholar
Woo, J. H., Clayton, M. J., Johnson, R. E., Flores, B. E., & Ellis, C. (2004). Dynamic knowledge map: Reusing experts’ tacit knowledge in the AEC industry. Automation in Construction, 13, pp. 203-207.WooJ. H.ClaytonM. J.JohnsonR. E.FloresB. E. & EllisC.(2004).Dynamic knowledge map: Reusing experts’ tacit knowledge in the AEC industry.Automation in Construction,13, pp.203-207.Search in Google Scholar
Wysocki, R. K. (2014). Effective Project Management – Traditional, Agile, Extreme, 7th edn. Wiley. Available at https://asalraac22.files.wordpress.com/2018/04/effective-project-management-traditional-agile-extreme-7th-edition.pdfWysockiR. K.(2014).Effective Project Management – Traditional, Agile, Extreme,7th edn.Wiley. Available at https://asalraac22.files.wordpress.com/2018/04/effective-project-management-traditional-agile-extreme-7th-edition.pdfSearch in Google Scholar
Xue, K., Hossain, M. U., Liu, M., Ma, M., Zhang, Y., & Hu, M., et al. (2021). BIM integrated LCA for promoting circular economy towards sustainable construction: An analytical review. Sustainability, 13, p. 1310. doi: 10.3390/su13031310.XueK.HossainM. U.LiuM.MaM.ZhangY. & HuM.. (2021).BIM integrated LCA for promoting circular economy towards sustainable construction: An analytical review.Sustainability,13, p.1310. doi:10.3390/su13031310.Open DOISearch in Google Scholar
Zeng, N., Ye, X., Peng, X., & König, M. (2019). Applying Kanban system in construction logistics for real-time material demand report and pulled replenishment. In: Proceedings of the 36th, 21-24 May 2019, Banff Alberta, Canada.ZengN.YeX.PengX. & KönigM.(2019).Applying Kanban system in construction logistics for real-time material demand report and pulled replenishment. In:Proceedings of the 36th, 21-24 May 2019, Banff Alberta, Canada.Search in Google Scholar